Catalogue
Prices are excluding VAT and transport. Carriage to site is priced by weight and distance as a separate item. The delivery time we give on request, together with a confirmed price. Stock levels we deliberately do not state: they change faster than the catalogue can be rewritten, and a broken promise about availability is worse than none.
How an order runs
There is no payment gateway here, and that is deliberate. A transformer is not bought in one click, it needs a confirmed voltage, vector group and delivery date. The selection therefore ends with a quotation we send back.
Selection
You put items into your selection. With a transformer the page offers you the design, the permitting and the transport itself.
Enquiry
You send the selection. If the rating and the voltage level are not settled yet, send us the substation documentation or your load profile.
Quotation
We come back with a binding price, the transport, the delivery time and what the price does not cover.
Delivery
Once the order is confirmed we deliver the equipment with its documents. Carriage to site we arrange if it is in the order.
The distribution range four months from approval of the manufacturing drawings, power transformers at 110 kV and above 7 to 12 months. The exact date we give on request and confirm in the quotation.
Thirty percent advance on signing the contract, the rest before dispatch, after a successful factory acceptance test (FAT).
Thirty-six months from delivery. The equipment is built to IEC 60076 and comes from a plant certified by TÜV.
Prices exclude transport. The supplier delivers DAP Hungary under Incoterms 2020; carriage to Slovakia we arrange and price separately.
We also supply equipment for the projects we design ourselves. If you have a substation or a switchyard under construction, write straight to dopyt@eens.sk. The rating, the winding connection and the impedance voltage we derive from the substation documentation.