Permitting
We represent you in dealings with the distribution system operator. We file applications, prepare the documentation the operator requires for its opinion, and support you during testing before the installation is put into service.
Technical connection conditions are set by the system operator under Section 19 of Act No. 251/2012 Coll. on energy; its rights and obligations are in Section 31 of the same act.
Applications and opinions
Filing, communication with the operator and tracking the validity of the opinion issued.
Documentation for approval
Design documentation to the extent the operator requires, including revisions after comments.
Conditions from the opinion
Conditions imposed in the opinion are carried into the design documentation one by one.
Pre-commissioning tests
Support during the official test under Section 12 of Decree No. 508/2009 Coll. and during functional testing.
How it works
Application
Filed with the distribution system operator.
Operator opinion
The operator sets the technical connection conditions and the reserved capacity.
Connection agreement
Signature of the agreement and payment of the connection charge.
Documentation
Design documentation to the extent the operator requires, including revisions after comments.
Closing instructions
What closes the case depends on the type of filing. We tell you what still has to be submitted and to whom.