EENS Catalogue

Design

Design documentation for electrical equipment, from a socket in a family house to an outdoor 110 kV switchyard. One designer across the whole range, so nobody has to hand the transition between voltage levels to three different firms.

230/400 V

Electrical installations

Family and apartment buildings, offices, retail, production halls, warehouses, agricultural buildings, data centres, outdoor areas, street lighting, EV chargers and standby supplies.

up to 1 kV

Service connections and metering points

Underground and overhead connections, connection cabinets, meter boards and main feeders. From the connection application to the installed meter.

22/0.4 kV

Substations

Packaged, pole-mounted and built-in. Distribution, customer, industrial and multi-transformer.

0.4 and 22 kV

Lines and networks

Underground and overhead lines at low and high voltage. Public distribution networks, site networks, sectionalising cabinets and boards.

22 to 110 kV

Switchyards and transformer stations

Switchyards and switching stations at 22 kV, outdoor air-insulated 110 kV switchyards and 110/22 kV transformer stations.

0.4 to 110 kV

Solar and battery storage

Roof, facade and ground-mounted plants and battery storage. Local source or licensed generator, including protection, fire disconnection and yield calculation.

STN EN 62305

Lightning and surge protection

Air termination, down conductors, earthing, separation distance and coordination of surge protective devices. The protection level follows risk management.

Outside our scope

We do not design 110 kV lines and above, whether underground or overhead. Switchyards and transformer stations at that level we do.

Stages of documentation

Under Section 9 of Act No. 25/2025 Coll. (the Building Act), in force since 1 April 2025. It replaced Act No. 50/1976 Coll.

  1. Building intent formerly DÚR
  2. Building design formerly DSP
  3. Design for notification simple structures
  4. Detailed design formerly DRS

As-built documentation, formerly DSPS, falls under Section 10 (4) of the same act into construction documentation. Operating documentation is covered by Section 11, and approval for use by Sections 66 and 67.

How it works

Step 01

Brief

The stage of documentation, the voltage level and what the installation has to do.

Step 02

Inputs

Site plan, survey, required capacity and the operator opinion if it has been issued.

Step 03

Calculations

Sizing, protection, short circuit, voltage drop and earthing.

Step 04

Documentation

Drawings, technical report, external influences protocol and bill of quantities.

Step 05

Consultation

Comments from authorities and network operators are worked into the documentation.